KAMEX FEATURED PROJECTS
ILAWC PIASA VALLEY SEWER SEPARATION PROJECT
- YEAR: 2021-2024
- LOCATION: Alton, IL
- COMPLETION DATE: December 2024
KAMEX was awarded this project by Illinois American Water in the Spring of 2021 and will continue to progress until the later part of 2023 before completion.
This project includes almost five miles of new sanitary sewer main in the Piasa Valley areas of Alton, along with approximately 300 homes or businesses will be hooked up to new sewer laterals.
When Illinois American Water acquired the Alton Regional Wastewater system the company made a commitment to address requirements set forth by the Illinois Environmental Protection Agency to remedy combined sewer overflows.
PULASKI SOLAR
- YEAR: 2024
- LOCATION: Karnak, IL
- OWNER: Vistra Energy
- CLIENT: Gemma Power
- COMPLETION DATE: In Progress
This project was awarded by Gemma Power in the Summer of 2024. The Pulaski Solar Project encompasses approximately 3,300 acres of a 490 MW DC solar energy facility.
SCOPE OF WORK:
- Tree clearing
- Erosion control
- Mass excavation (500,000 + CY)
- Gravel access roads
- Gravel laydown yards
- Stabilization of roadways
- Electrical trenching
- Sediment basins with associated piping
- Roadway culverts
- Creek culvert
- Temp & final seeding
CEDAR RIDGE SUBDIVISION PROJECT
- YEAR: 2024- Present
- LOCATION: Edwardsville, IL
- COMPLETION DATE: In Progress
Welcome to The Homes at Cedar Ridge, an idyllic subdivision nestled in the picturesque countryside just north of Edwardsville. Located less than 10 minutes from town, this community offers the perfect blend of serene rural living and convenient access to urban amenities.
Surrounded by lush greenery and rolling hills, residents of Cedar Ridge enjoy a peaceful atmosphere and stunning natural views right outside their doorstep. With spacious lots and beautifully crafted homes, Cedar Ridge provides a harmonious balance between privacy and community, making it an ideal place to call home for those seeking a tranquil yet accessible lifestyle.
AMAZON WAREHOUSE- 933,656 SF
- CLIENT: Contegra Construction
- LOCATION: Pontoon Beach, IL
- YEAR: 2025
- COMPLETION DATE: In Progress
- OWNER: Amazon
SCOPE OF WORK:
- 250,000 CY of Mass Grading
- 950,000 SF of 24'' Lime Stabilization - 3.5% Rate
- 2,169,000 SF of 12'' Lime Stabilization - 3.5% Rate
- 15,000 LF of Storm Sewer - 12'' LF - 48'' Size
- 3900 LF of Sanitary Sewer
- 6,800 LF of American Water 12'' Ductile Iron Pipe Water Main Extension
- 6,000 LF of Firemain Loop & LeedIns / Hot Box / Valves
New Paragraph
AMERESCO RNG FACILITY
- CLIENT: Ameresco
- LOCATION: Roxana, IL
- COMPLETION DATE: December 2023
KAMEX recently completed a 6.5 Million Dollar project for Republic Services thru Ameresco. From the ground up KAMEX self-performed and completed all the site work mass grading, roads, and utilities for the project. Along with the sitework package KAMEX was awarded the GC & Structural Foundation scopes of work. Crews poured over 4000 cubic yards of concrete for twenty isolated structural foundations to facilitate equipment. These foundations ranged anywhere from 1.5 ft thick to 4ft thick. KAMEX crews also constructed a 12,000 sf masonry block compressor building and 4,500 sf masonry block electrical building consisting of structural bar joist roof decking and insulated EPDM roofing.. Along with constructing these structures, the crews self-performed all hardware, doors, finish carpentry, painting, and plumbing. This project was a great fit for us and showcased the diversity and wide range of services we have here at KAMEX.
AISIN DISTRIBUTION CENTER
- CLIENT: Brinkman Constructors
- LOCATION: Marion, IL
- COMPLETION DATE: September 2023
SCOPE OF WORK:
- Grading and Stabilization of new 463,500 SF Distribution Center
- 114,000 Cut/Fill
- 3,600 LF of Storm Sewer - 12" - 42" RCP
- 250 LF of Sanitary Sewer
- 4,200 LF of Watermain Loop
- 102,000 SY of 12 Depth Cement Stabilization - 5%
- Over 1,800 TONS of Drying Lime
CHAMP LANDFILL
CELL 3C LINER
- CLIENT: Waste Connections
- LOCATION: Maryland Heights, MO
- COMPLETION DATE: 2023
KAMEX recently completed a very complex and challenging 11 Acre Cell for Champ Landfill. This particular project was constructed at the bottom floor elevation of an active quarry. Crews worked alongside with New Frontier Quarry personnel to not disrupt mining operations and moved over 150,000 cubic yards of material consisting of Overburden, Aggregate Drainage Layer, Shot Rock Fill Wedge, Clay Liner Material, and the final Leachate Drainage Layer. Prior to cell excavation crews completed extensive rock excavations and dewatering operations to facilitate leachate underdrain piping. All work was self-performed by KAMEX crews and completed per a strict schedule.
RUSH TRUCKING
- CLIENT: GEIS Construction
- LOCATION: Pontoon Beach, IL
- COMPLETION DATE: 2023
SCOPE OF WORK:
- 23,000 CY Onsite Cut / FIll
- 40,000 SY of Lime Stabilization
- 2000 LF Onsite Storm and Sanitary Sewer
- 2500 LF Offsite Sanitary Sewer Extension
- 10'' Water line and Complete Concrete Vault Vault
FEATURED PROJECT 2023
ILAWC PIASA VALLEY SEWER SEPARATION PROJECT
- YEAR: 2021-2023
- LOCATION: Alton, IL
- COMPLETION DATE: In Progress
Kamex was awarded this project by Illinois American Water in the Spring of 2021 and will continue to progress until the later part of 2023 before completion.
This project includes almost five miles of new sanitary sewer main in the Piasa Valley areas of Alton, along with approximately 300 homes or businesses will be hooked up to new sewer laterals.
When Illinois American Water acquired the Alton Regional Wastewater system the company made a commitment to address requirements set forth by the Illinois Environmental Protection Agency to remedy combined sewer overflows.